Fujian Pingnan Jiufeng Hydropower Project
#137of 1935 in Renewable energy#36of 1084 in China#82of 1459 in CDM (UNFCCC)#48of 806 in AMS-I.D
Audit Analysis
A small CDM hydropower project in Fujian, China, using the standardised AMS-I.D methodology with a jurisdictional grid-emission-factor baseline. Additionality was confirmed by the VVB via an investment test, and the verified emission reductions (12,936 tCO₂) are modestly above the claimed figure (12,189 tCO₂) for the same monitoring period, indicating no over-crediting. Several documentation gaps and a baseline-method contradiction between the validation and monitoring reports temper the overall assessment.
Red Flags
- Baseline method is described as 'jurisdictional' in the 2012 monitoring report but as 'project' in the 2009 validation report — an unresolved inconsistency that could affect the validity of the baseline calculation.
- Grid emission factor is from 2006 (0.8888 tCO₂/MWh); no evidence of a more recent or updated factor was found in the extracted documents.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 8,248 | 0 | 8,248 | |
| 2013 | 12,936 | 0 | 12,936 | |
| Total | 21,184 | 0 | 21,184 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
Negligible, justified for grid-displacement hydro
Method contradiction; 2006 grid EF
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →