Skip to main content
CDMHydroChinaAMS-I.D

Fujian Pingnan Tingtougang Hydropower Project

CDM-2559 ↗

#180of 1935 in Renewable energy#55of 1084 in China#106of 1459 in CDM (UNFCCC)#64of 806 in AMS-I.D

6.4/ 10
Integrity
6.5
Transparency
6.0
Claim Safety
7.0
Documentation
6.0

Audit Analysis

A small CDM-registered hydropower project in Fujian, China, using the AMS-I.D. grid-connected renewable methodology. Additionality was confirmed by the VVB via an investment test, and the jurisdictional baseline is appropriate for the methodology. The project significantly over-delivered relative to its ex-ante estimate during the monitored period, providing a strong safety margin, though several transparency fields (CORSIA, CCP, usage monitoring) remain unreported.

Red Flags

  • Grid emission factor is from 2007 with no documented reassessment date; the factor may not reflect current grid conditions
  • CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
  • Contradiction in total ERR claimed between the 2010 and 2012 monitoring reports (31,954 vs 51,241) suggests possible revision or inconsistent reporting

Credit Vintages

IssuedRetiredAvailable
2011
31,954031,954
2013
45,587045,587
Total77,541077,541

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

low inherent risk (hydro)

Leakage

Negligible, justified for small hydro

Baseline

Jurisdictional but EF from 2007, no reassessment date

Safeguards

Mentioned and benefit sharing described; FPIC/grievance not

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-I.D. Grid connected renewable electricity generation

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents