Fujian Pingnan Tingtougang Hydropower Project
#180of 1935 in Renewable energy#55of 1084 in China#106of 1459 in CDM (UNFCCC)#64of 806 in AMS-I.D
Audit Analysis
A small CDM-registered hydropower project in Fujian, China, using the AMS-I.D. grid-connected renewable methodology. Additionality was confirmed by the VVB via an investment test, and the jurisdictional baseline is appropriate for the methodology. The project significantly over-delivered relative to its ex-ante estimate during the monitored period, providing a strong safety margin, though several transparency fields (CORSIA, CCP, usage monitoring) remain unreported.
Red Flags
- Grid emission factor is from 2007 with no documented reassessment date; the factor may not reflect current grid conditions
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- Contradiction in total ERR claimed between the 2010 and 2012 monitoring reports (31,954 vs 51,241) suggests possible revision or inconsistent reporting
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 31,954 | 0 | 31,954 | |
| 2013 | 45,587 | 0 | 45,587 | |
| Total | 77,541 | 0 | 77,541 |
Risk Indicators
VVB-confirmed investment test
low inherent risk (hydro)
Negligible, justified for small hydro
Jurisdictional but EF from 2007, no reassessment date
Mentioned and benefit sharing described; FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →