Fujian Shouning Xiadongxi 25MW Hydropower Project

CDM-2156 ↗

#941of 1935 in Renewable energy#497of 1084 in China#683of 1459 in CDM (UNFCCC)#738of 1287 in ACM0002

5.2/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.0

Audit Analysis

A 25 MW small-scale hydropower project in China displacing grid electricity, validated under CDM with a jurisdictional baseline and VVB-confirmed investment additionality test. The project is inherently low-risk in terms of permanence (avoidance-type), but the validation report flagged 11 corrective actions including IRR calculation errors and an incomplete common-practice analysis, which weaken confidence in the additionality case. Verified emission reductions for the monitoring period are not stated in the extracted record, limiting the ability to confirm delivery against expectations.

Red Flags

  • Eleven corrective actions were required at validation, including IRR calculation inconsistencies between the spreadsheet and PDD (CAR4) and an incomplete list of similar projects in the common-practice analysis (CAR5), undermining the robustness of the additionality case.
  • The baseline calculation was not updated with the latest 2006 statistics at the time of validation (CAR6), and the grid emission factor used is from 2005, raising questions about whether the baseline reflects the most current grid mix.
  • Verified emission reductions for the monitoring period (Sep–Dec 2012) are not stated in the extracted record, preventing a direct delivery check.
  • Two contradictions exist in the extracted data: the claimed ERR differs between two monitoring reports (15,372 vs 75,759), and the crediting period differs between the PDD and the later monitoring report.

Credit Vintages

IssuedRetiredAvailable
2011
121,2850121,285
2012
60,581060,581
2013
91,131091,131
Total272,9970272,997

Risk Indicators

Additionality

VVB-verified investment test, but 11 CARs including IRR erro

Permanence

Avoidance-type hydro project; no reversal risk identified

Leakage

0% deduction, deemed negligible—reasonable for grid-displace

Baseline

Jurisdictional grid EF (2005 data); not updated with 2006 st

Safeguards

Safeguards mentioned and benefit-sharing described, but FPIC

Double-claim

CORSIA eligibility and CCP status not stated in available do

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents