Fujian Wuyishan Wenlin River 2nd and 3rd Level Hydropower Station
#1237of 1935 in Renewable energy#722of 1084 in China#963of 1459 in CDM (UNFCCC)#403of 806 in AMS-I.D
Audit Analysis
A small-scale CDM hydro project (AMS-I.D. v18.0) in Fujian, China, with a jurisdictional grid baseline and a 7-year crediting period. The project was validated by CCCI and registered, but the extracted record lacks confirmation of the specific additionality test, verified emission reductions, and any monitoring report, creating meaningful evidence gaps. No contradictions were found, and the three material findings were minor administrative issues requiring no corrective action.
Red Flags
- Additionality test type and VVB verification status are not stated in the extracted record — a core CDM requirement cannot be independently confirmed from available documents
- No verified emission reduction figures (total ERR verified) are present in the record, preventing any pro-rata delivery check against the 113,904 tCO₂e lifetime claim
- No monitoring report appears in the evidence documents despite a monitoring period extending to October 2022
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 13,127 | 0 | 13,127 | |
| 2012 | 31,338 | 0 | 31,338 | |
| Total | 44,465 | 0 | 44,465 |
Risk Indicators
Test type and VVB confirmation not stated in record
no reversal events reported
0% deduction, deemed negligible — consistent with small hydr
Jurisdictional grid EF (0.71695, 2014), reassessed 2016
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →