Fujian Zhangpu Liuao 30.6 MW Wind Power Project
#765of 1935 in Renewable energy#376of 1084 in China#543of 1459 in CDM (UNFCCC)#593of 1287 in ACM0002
Audit Analysis
A 30.6 MW onshore wind project in Fujian, China, validated under CDM methodology ACM0002 v19.0 with a jurisdictional grid-emission-factor baseline. The project shows no material findings, no corrective actions, and a reasonable zero-leakage treatment, but the extracted record lacks an explicit additionality test description, a monitoring report, and several safeguards details, leaving moderate evidence gaps.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality basis unverified from available documents
- No monitoring report or monitoring period is present in the evidence set, so post-validation performance cannot be independently confirmed
- CORSIA eligibility and CCP status are not stated, leaving dual-channel or double-claim risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2006 | 22,202 | 0 | 22,202 | |
| 2007 | 33,084 | 0 | 33,084 | |
| 2008 | 39,121 | 0 | 39,121 | |
| 2010 | 35,331 | 0 | 35,331 | |
| 2011 | 32,982 | 0 | 32,982 | |
| 2012 | 38,143 | 0 | 38,143 | |
| 2013 | 38,076 | 0 | 38,076 | |
| Total | 238,939 | 0 | 238,939 |
Risk Indicators
Test type not stated in record
Avoidance project, no reversal risk
0% deemed negligible, justified
Jurisdictional, reassessed 2019
Mentioned but FPIC/grievance unstated
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →