Güney-1 WPP
GS-2587 ↗ · current registry ID: GS7742
#13of 295 in Turkey#21of 1801 in Gold Standard (GS)#45of 1287 in ACM0002
Audit Analysis
Güney-1 WPP is a Gold Standard wind power project in Turkey with VVB-confirmed additionality (combined test by RINA Services) and no reversal events. The project delivered approximately 75% of its pro-rata ex-ante expectation for the two-year monitoring period, indicating conservative crediting. However, four contradictions between the verification and monitoring reports—spanning baseline method, leakage justification, claimed ERR, and crediting period dates—reduce confidence in data consistency.
Red Flags
- Four contradictions between the verification report (2025-02-25) and monitoring report (2024-12-03) on baseline method, leakage justification, claimed ERR, and crediting period dates undermine data reliability
- Grid emission factor of 0.6482 tCO2/MWh is from 2019 and may not reflect current Turkish grid mix
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 70,779 | 0 | 70,779 | |
| 2023 | 118,447 | 0 | 118,447 | |
| 2024 | 47,590 | 0 | 47,590 | |
| Total | 236,816 | 0 | 236,816 |
Risk Indicators
VVB-confirmed combined test
mixed evidence / unresolved risk
0% deduction, justification inconsistent across docs
Project-specific per VR; contradicted by MR
Grievance mechanism and benefit sharing present; FPIC not conducted
CORSIA and CCP status not stated in available records
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →