Gangwon+Inje+Ansan Renewable Energy Bundling Project
#1454of 1935 in Renewable energy#19of 24 in South Korea#1201of 1459 in CDM (UNFCCC)#484of 806 in AMS-I.D
Audit Analysis
A small CDM wind project in South Korea with VVB-confirmed additionality and a jurisdictional baseline, but severely limited by the absence of any monitoring data, a 10× discrepancy in claimed emissions reductions between the PDD and validation report, and six material findings raised during validation. The project's inherent low reversal risk as a wind avoidance project is a positive, but the data gaps and documentation inconsistencies significantly undermine confidence in the credit figures.
Red Flags
- 10× discrepancy in total ERR: the PDD states 111,300 tCO₂e while the validation report states 11,130 tCO₂e — a factor-of-ten error that raises serious over-crediting risk if the PDD figure was used for issuance
- Six material findings (CARs) raised during validation, including a methodology version inconsistency, prior-consideration evidence gaps, a utilization-ratio mismatch between the PDD and supporting spreadsheets, and a mid-process change in the additionality demonstration tool
- No monitoring reports, verified ERR figures, or monitoring period data found in any available document — the project's actual performance is entirely unverified
- Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but test type inconsistent across documents
Wind avoidance project, no reversal risk expected
Deemed negligible, reasonable for wind
Jurisdictional but grid EF from 2008, no reassessment date
Safeguards and benefit-sharing mentioned, no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →