Skip to main content
CDMWindChinaACM0002

Ganhekou V 201MW Wind Farm Project

CDM-4278 ↗

#1238of 1935 in Renewable energy#723of 1084 in China#965of 1459 in CDM (UNFCCC)#961of 1287 in ACM0002

4.8/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.5
Documentation
4.0

Audit Analysis

The Ganhekou V 201MW Wind Farm is a CDM-registered wind project with a jurisdictional baseline and VVB-confirmed additionality, but the available record is limited to validation-stage documents with no monitoring data. Nine material findings and eight corrective actions in the validation report reveal significant PDD drafting errors, and the absence of any verified emission reduction figures prevents independent validation of the 341,946 tCO2e lifetime claim.

Red Flags

  • Nine material findings and eight corrective actions in the validation report indicate substantial PDD drafting errors, including incorrect OM/BM weight values, missing ex-ante parameters, and two monitored parameters (EGExport, EGImport) omitted from the PDD
  • No monitoring report or verified emission reduction figure is available in the extracted record, making it impossible to confirm whether the 341,946 tCO2e lifetime claim was actually delivered
  • The validation report notes a 62-day delay in the notification of intention to renew the crediting period, suggesting administrative compliance gaps

Credit Vintages

IssuedRetiredAvailable
2011
175,7300175,730
2013
444,0250444,025
Total619,7550619,755

Risk Indicators

Additionality

VVB-confirmed

Permanence

Avoidance project, no reversals

Leakage

0% justified for grid-connected wind

Baseline

Jurisdictional, reassessed 2018

Safeguards

Mentioned but FPIC and grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents