Ganluo Aga Hydropower Project
#1365of 1935 in Renewable energy#827of 1084 in China#1101of 1459 in CDM (UNFCCC)#1053of 1287 in ACM0002
Audit Analysis
The Ganluo Aga Hydropower Project is a CDM-registered small hydro scheme in China with a VVB-confirmed combined additionality test and a jurisdictional baseline, but the record is undermined by 11 material findings in the validation report, the complete absence of any verification or monitoring data, and a low extraction confidence rating. The project's claimed lifetime emissions reductions of roughly 487,000 tCO₂e over seven years cannot be independently corroborated from the available documents.
Red Flags
- Eleven material findings in the validation report, including an incorrect installed capacity, a benchmark document that was not yet effective at the investment decision date, missing financial parameters, and an inconsistent monitored parameter relative to the methodology
- No verification or monitoring report data is present in the extracted record despite the crediting period (2014–2020) having fully elapsed, making it impossible to confirm actual emissions reductions
- Low extraction confidence across the document set, indicating at least one key document was poorly readable and the structured data may be incomplete
- Contradiction between the PDD (additionality described as an investment test) and the validation report (combined test), creating ambiguity about the actual additionality basis
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
Hydro – no reversal risk
0% deemed negligible; PDD/VVB wording differs
Jurisdictional grid EF (0.7707, 2010)
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →