Skip to main content
CDMHydroChinaACM0002

Ganluo Kaijianqiao Hydropower Project, P.R.China

CDM-1432 ↗

#1366of 1935 in Renewable energy#828of 1084 in China#1102of 1459 in CDM (UNFCCC)#1054of 1287 in ACM0002

4.6/ 10
Integrity
4.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A small-scale CDM hydropower project in China validated by TÜV NORD CERT, with a jurisdictional baseline and a 7-year crediting period. The validation report identified five material findings, including errors in the grid emission factor calculation and baseline equation formulation, which raise moderate over-crediting concerns. Key verification and monitoring data are absent from the available record, limiting confidence in actual delivery.

Red Flags

  • Five material findings in the validation report, including an incorrect grid emission factor calculation (CAR B2) and baseline equations not aligned with the methodology (CAR B3), indicating significant technical errors at validation
  • No verification or monitoring reports appear in the evidence set, so actual credit issuance versus claimed ERR cannot be independently confirmed
  • Corrective actions list is empty despite five identified CARs, creating a documentation gap on how the errors were resolved
  • Additionality test type and VVB confirmation are not stated in the extracted record, leaving a gap in a mandatory CDM requirement

Credit Vintages

IssuedRetiredAvailable
2009
271,7580271,758
2010
160,8980160,898
2011
184,6200184,620
2012
126,8460126,846
2013
128,9210128,921
Total873,0430873,043

Risk Indicators

Additionality

Not explicitly confirmed in extracted record

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, minor doc inconsistency

Baseline

Jurisdictional, grid EF 2013

Safeguards

Mentioned but FPIC and grievance not detailed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents