Ganluo Kaijianqiao Hydropower Project, P.R.China
#1366of 1935 in Renewable energy#828of 1084 in China#1102of 1459 in CDM (UNFCCC)#1054of 1287 in ACM0002
Audit Analysis
A small-scale CDM hydropower project in China validated by TÜV NORD CERT, with a jurisdictional baseline and a 7-year crediting period. The validation report identified five material findings, including errors in the grid emission factor calculation and baseline equation formulation, which raise moderate over-crediting concerns. Key verification and monitoring data are absent from the available record, limiting confidence in actual delivery.
Red Flags
- Five material findings in the validation report, including an incorrect grid emission factor calculation (CAR B2) and baseline equations not aligned with the methodology (CAR B3), indicating significant technical errors at validation
- No verification or monitoring reports appear in the evidence set, so actual credit issuance versus claimed ERR cannot be independently confirmed
- Corrective actions list is empty despite five identified CARs, creating a documentation gap on how the errors were resolved
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving a gap in a mandatory CDM requirement
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 271,758 | 0 | 271,758 | |
| 2010 | 160,898 | 0 | 160,898 | |
| 2011 | 184,620 | 0 | 184,620 | |
| 2012 | 126,846 | 0 | 126,846 | |
| 2013 | 128,921 | 0 | 128,921 | |
| Total | 873,043 | 0 | 873,043 |
Risk Indicators
Not explicitly confirmed in extracted record
Avoidance project, no reversal risk
0% deemed negligible, minor doc inconsistency
Jurisdictional, grid EF 2013
Mentioned but FPIC and grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →