Skip to main content
CDMHydroChinaACM0002

Ganluo Wagujiao Hydropower Project

CDM-6269 ↗

#1308of 1935 in Renewable energy#789of 1084 in China#1034of 1459 in CDM (UNFCCC)#1016of 1287 in ACM0002

4.7/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
3.5

Audit Analysis

The Ganluo Wagujiao small hydro project (CDM-6269) has a confirmed additionality assessment and a jurisdictional grid-emission-factor baseline, but the validation report flagged 15 material findings and required 16 corrective actions, indicating significant PDD quality issues at the time of validation. No monitoring reports or verified emission reductions were found in the extracted record, and the crediting period (2014–2020) has already expired without available post-validation data. The project is a low-complexity small hydro scheme, which inherently limits reversal and leakage risk, but the documentation gaps and contradictions between the PDD and validation report reduce confidence in the overall credit quality.

Red Flags

  • 15 material findings at validation, including incorrect geographic coordinates, wrong turbine type, missing financial parameters, and insufficient sensitivity analysis — all requiring corrective action before registration
  • No monitoring reports or verified emission reductions found in the extracted record despite the crediting period (2014–2020) having expired
  • Contradiction between PDD and validation report on leakage treatment (PDD implies quantified leakage; validation report states deemed negligible)
  • Minimum extraction confidence rated low, indicating at least one key document was poorly readable or incomplete
  • No buffer pool, permanence mechanism, or reversal-risk mitigation documented for the project

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, PDD/VR contradiction resolved

Baseline

Jurisdictional grid EF (0.7707, 2010)

Safeguards

Safeguards mentioned, FPIC and grievance not confirmed

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents