Gansu Dang River Hydropower Project
#1239of 1935 in Renewable energy#724of 1084 in China#966of 1459 in CDM (UNFCCC)#962of 1287 in ACM0002
Audit Analysis
The Gansu Dang River Hydropower Project is a CDM-registered small hydro scheme with a jurisdictional baseline and combined additionality test, but the validation report identified four material findings requiring corrective action, including a crediting period that exceeded the methodology maximum and baseline emission factors inconsistent with national data. Transparency is limited by the absence of monitoring or verification reports and several key MRV parameters that are not stated in the available record. The grid emission factor contradiction between the validation report and an appendix introduces uncertainty into the credit calculation.
Red Flags
- Four material findings in the validation report, including a crediting period of 21 years in PDD v06 exceeding the 7-year maximum allowed under ACM0002, and baseline emission factors not aligned with 2013 China DNA data
- Grid emission factor contradiction: 0.6266 tCO2/MWh in the validation report versus 0.972 in an appendix, a 55% discrepancy that affects the credit calculation
- No monitoring or verification reports found in the extracted record; the only ERR data point (141,169) appears identically as both claimed and verified, with no independent measurement evidence
- Additionality confirmation by the VVB is not explicitly stated in the extracted record despite the presence of a combined test
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 30,285 | 0 | 30,285 | |
| 2010 | 116,494 | 0 | 116,494 | |
| 2011 | 311,322 | 0 | 311,322 | |
| 2013 | 334,273 | 0 | 334,273 | |
| Total | 792,374 | 0 | 792,374 |
Risk Indicators
Combined test present but VVB confirmation not explicitly st
Hydro asset; no reversal events recorded; low inherent risk
0% deduction; reasonable for small hydro; deemed negligible
Jurisdictional baseline; material finding on EF alignment wi
Safeguards mentioned and benefit-sharing described; FPIC and
CORSIA and CCP status not stated in available record
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →