Gansu Diebu Duoer 32MW Hydropower Project
#678of 1935 in Renewable energy#325of 1084 in China#466of 1459 in CDM (UNFCCC)#524of 1287 in ACM0002
Audit Analysis
A 32 MW small-hydropower project in Gansu, China, displacing grid electricity under the well-established ACM0002 methodology. The jurisdictional baseline and negligible-leakage treatment are appropriate for the project type, and the ERR figures are internally consistent (annual × 7-year crediting period). Key gaps include the absence of an explicitly stated additionality test type, missing monitoring-period details, and one unidentified source document, which limit confidence in the full evidentiary record.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the additionality assessment undocumented in the available data
- One of the four source documents is listed as 'unknown', reducing confidence in the completeness of the evidence base
- No monitoring report or monitoring-period data was found in the extracted record, limiting verification of actual performance against the ex-ante estimate
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 72,438 | 0 | 72,438 | |
| 2011 | 117,682 | 0 | 117,682 | |
| 2012 | 107,390 | 0 | 107,390 | |
| 2016 | 114,604 | 0 | 114,604 | |
| 2017 | 74,972 | 0 | 74,972 | |
| 2022 | 230,980 | 0 | 230,980 | |
| Total | 718,066 | 0 | 718,066 |
Risk Indicators
Test type not stated in record; VVB validation implies asses
Avoidance project (grid displacement); no reversal risk or e
0% deduction, deemed negligible—appropriate for hydropower d
Jurisdictional grid EF (0.6066, 2019); reassessed 2021
Safeguards and benefit-sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →