Gansu Guazhou Ganhekou No 1 Wind Farm Project
#942of 1935 in Renewable energy#498of 1084 in China#684of 1459 in CDM (UNFCCC)#739of 1287 in ACM0002
Audit Analysis
A CDM wind farm project with a verified additionality assessment, jurisdictional baseline, and no material findings, but significant documentation gaps including the absence of monitoring reports and low extraction confidence. The ERR figures show a discrepancy between the PDD and validation report that is most likely an annual-versus-lifetime reporting difference, though it is not explicitly clarified. Inherent risk is low given the wind-energy sector, but the evidentiary record is thin.
Red Flags
- ERR figure discrepancy: the PDD (Jan 2019) reports 2,327,801 tCO₂ while the validation report (Jan 2019) reports 332,543 tCO₂; the ratio (~7×) matches the 7-year crediting period, suggesting an annual-vs-lifetime basis difference, but neither document explicitly states the reporting basis
- No monitoring reports are present in the extracted record despite the crediting period running from January 2018 to January 2025
- Minimum extraction confidence is rated low, indicating at least one key document was poorly readable
- FNRB (first-year net reduction benefit) value and method are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2012 | 252,362 | 0 | 252,362 | |
| 2013 | 258,239 | 0 | 258,239 | |
| Total | 510,601 | 0 | 510,601 |
Risk Indicators
VVB-confirmed
Wind – no reversal risk
Negligible, justified
Jurisdictional, reassessed 2019
Mentioned, details absent
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →