Skip to main content
CDMWindChinaACM0002

Gansu Guazhou Qiaowan Second Phase Wind Farm Project

CDM-6528 ↗

#842of 1935 in Renewable energy#431of 1084 in China#592of 1459 in CDM (UNFCCC)#656of 1287 in ACM0002

5.3/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
6.5
Documentation
5.0

Audit Analysis

A CDM-registered wind farm in Gansu, China, using a jurisdictional grid-emission-factor baseline (0.7674 tCO₂/kWh, 2018) with a 7-year crediting period. The project's core design is sound for a wind displacement project, but the extracted record lacks explicit additionality documentation, safeguards detail (FPIC, grievance mechanism), and any monitoring-period verification reports, leaving several key integrity and transparency questions unresolved.

Red Flags

  • Additionality test type and VVB confirmation are not stated in any extracted document, despite being a mandatory CDM requirement; the project's CDM registration implies it passed, but the evidence is not in the available record.
  • One material finding (CL01) notes that the percentage of fossil-fuel generation in the Northwest Power Grid over the prior five years was not listed in the baseline documentation, potentially weakening the grid-emission-factor basis.
  • No monitoring-period verification reports appear in the evidence list; only the validation report (Feb 2020) and PDD are identified, leaving post-registration performance unverified in the available data.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Not stated in extracted record; CDM registration implies it

Permanence

Wind displacement – no reversal risk; no reversal events rep

Leakage

0% deduction, 'deemed negligible' – appropriate for grid-con

Baseline

Jurisdictional grid EF (0.7674, 2018), reassessed 2020

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated – dual-channel risk unasses

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents