Gansu Huanghe Bingling Hydropower Station Project

VCS-453 ↗

#1142of 1935 in Renewable energy#665of 1084 in China#765of 1339 in Verra (VCS)#893of 1287 in ACM0002

4.9/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
5.0
Documentation
5.5

Audit Analysis

A registered VCS hydropower project (ACM0002) with VVB-confirmed additionality and a jurisdictional baseline, but the record is marred by multiple cross-document contradictions on baseline method, leakage justification, and claimed ERR figures. A material finding in the verification report flags a 47.4% under-delivery relative to the PDD estimate for the 2009 period and incomplete metering documentation, while one corrective action on monitoring details remains open. The project's inherent low permanence risk as a hydropower asset is partially offset by the absence of any stated buffer pool.

Red Flags

  • Material finding: actual emission reductions of 142,109 tCO2e in the 2009 period were 47.4% below the PDD estimate of 270,139.1 tCO2e, indicating the ex-ante model was significantly miscalibrated.
  • Contradiction on baseline method: the 2009 monitoring report describes a project-specific baseline while the 2025 monitoring report describes a jurisdictional baseline — a fundamental methodological shift that is not explained in the available documents.
  • Contradiction on leakage justification: one monitoring report states leakage was quantified while the 2025 monitoring report states it was deemed negligible with a 0% deduction, and no quantified leakage figure appears in the extracted record.
  • One corrective action (complete details on monitoring meters and multiplication factors) remains open in the verification report.

Credit Vintages

IssuedRetiredAvailable
2008
27,140027,140
2009
16,005016,005
2013
889,31220,993868,319
2014
838,5769,452829,124
2015
763,8983,363760,535
Total2,534,93133,8082,501,123

Risk Indicators

Additionality

VVB-confirmed but test type not stated

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' contradicts earlier 'quantified'

Baseline

Jurisdictional per 2025 but was project-specific in 2009; no reassessment documented

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents