Skip to main content
CDMWindChinaACM0002

Gansu Jingtai 45MW Wind Power Project

CDM-2766 ↗

#549of 1935 in Renewable energy#250of 1084 in China#367of 1459 in CDM (UNFCCC)#417of 1287 in ACM0002

5.7/ 10
Integrity
6.0
Transparency
4.5
Claim Safety
6.5
Documentation
5.5

Audit Analysis

A 45 MW onshore wind project in Gansu, China, validated under CDM methodology ACM0002 v19.0 with a jurisdictional grid-emission-factor baseline and VVB-confirmed additionality. The project presents low inherent risk as an avoidance-type renewable energy credit, but the available record lacks any monitoring-period data, verified emission reductions, or buffer-pool information, limiting confidence in actual delivery.

Red Flags

  • No monitoring report or verified emission-reduction figure is present in the extracted record, so actual delivery against the 452,333 tCO₂e lifetime claim cannot be assessed.
  • Buffer-pool percentage and reversal-event history are not stated in any available document, leaving permanence safeguards unconfirmed.
  • CORSIA eligibility and CCP status are both unstated, creating ambiguity about dual-channel or double-claim risk.

Credit Vintages

IssuedRetiredAvailable
2014
244,8540244,854
Total244,8540244,854

Risk Indicators

Additionality

VVB-confirmed

Permanence

Avoidance project, no storage risk

Leakage

Deemed negligible, reasonable for grid wind

Baseline

Jurisdictional grid EF, reassessed 2019

Safeguards

Mentioned but FPIC/grievance not detailed

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents