Gansu Jingtai Qianfeng Wind Power Project
#679of 1935 in Renewable energy#326of 1084 in China#467of 1459 in CDM (UNFCCC)#525of 1287 in ACM0002
Audit Analysis
A straightforward CDM wind power project in Gansu, China, using a jurisdictional grid baseline (EF 0.7674, 2017) and validated by CTI. The project presents no reversal risk and a reasonable 0% leakage deduction, but the extracted record lacks explicit confirmation of the additionality test type, monitoring period details, and CORSIA/CCP status, leaving several evidence gaps. One minor compliance log (missing load factor in PDD) was raised and closed with no corrective actions outstanding.
Red Flags
- Additionality test type and explicit VVB confirmation are not stated in the extracted record, leaving the additionality assessment partially opaque
- The PDD reports a lifetime ERR of 503,020 tCO₂e while the validation report states 71,860 tCO₂e; although consistent on a per-year basis (503,020 ÷ 7 ≈ 71,860), the discrepancy in presentation could confuse readers
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed
- One of the four source documents is listed as 'unknown', reducing confidence in the completeness of the evidence base
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Validation exists but test type unconfirmed in record
Wind project – no reversal risk
0% deemed negligible – standard for wind
Jurisdictional grid EF, reassessed 2019
Mentioned and benefit sharing described; FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →