Skip to main content
CDMWindChinaACM0002

Gansu Jingtai Shatangzi Wind Power Project

CDM-5995 ↗

#550of 1935 in Renewable energy#251of 1084 in China#368of 1459 in CDM (UNFCCC)#418of 1287 in ACM0002

5.7/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
7.0
Documentation
5.0

Audit Analysis

A CDM wind power project in Gansu, China, validated by CTI with a jurisdictional grid-emission-factor baseline. The project is inherently low-risk in terms of permanence and leakage, but the extracted record lacks monitoring reports and several key verification details, limiting confidence in the full MRV chain. The apparent ERR contradiction between the PDD and validation report is resolved by different time bases (lifetime vs. first monitoring period).

Red Flags

  • Additionality test type and VVB confirmation are not explicitly stated in the extracted record, leaving a gap in verifying the additionality assessment was properly conducted
  • No monitoring reports were found in the extracted documentation despite the project being mid-crediting period (2019–2026), limiting verification of actual performance
  • A material finding (CL 1) was raised during validation regarding missing load factor and lifetime information in the PDD, though it was subsequently closed

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Test type not explicitly stated in extracted data

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, consistent with grid-connected wind

Baseline

Jurisdictional grid EF, reassessed at project start

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents