Gansu Jingtai Shatangzi Wind Power Project
#550of 1935 in Renewable energy#251of 1084 in China#368of 1459 in CDM (UNFCCC)#418of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Gansu, China, validated by CTI with a jurisdictional grid-emission-factor baseline. The project is inherently low-risk in terms of permanence and leakage, but the extracted record lacks monitoring reports and several key verification details, limiting confidence in the full MRV chain. The apparent ERR contradiction between the PDD and validation report is resolved by different time bases (lifetime vs. first monitoring period).
Red Flags
- Additionality test type and VVB confirmation are not explicitly stated in the extracted record, leaving a gap in verifying the additionality assessment was properly conducted
- No monitoring reports were found in the extracted documentation despite the project being mid-crediting period (2019–2026), limiting verification of actual performance
- A material finding (CL 1) was raised during validation regarding missing load factor and lifetime information in the PDD, though it was subsequently closed
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Test type not explicitly stated in extracted data
Avoidance project, no reversal risk
0% deemed negligible, consistent with grid-connected wind
Jurisdictional grid EF, reassessed at project start
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →