Gansu Jingtieshan Hydro Power Project
#1240of 1935 in Renewable energy#725of 1084 in China#967of 1459 in CDM (UNFCCC)#963of 1287 in ACM0002
Audit Analysis
The Gansu Jingtieshan Hydro Power Project is a CDM-era hydro avoidance project with a jurisdictional baseline and a combined additionality test, but the available record is limited to validation-stage documents with no monitoring or verification reports. A significant discrepancy between the PDD (89,704 tCO₂e) and the validation report (627,928 tCO₂e) undermines confidence in the claimed emission reductions, and the absence of verified monitoring data prevents any assessment of actual delivery.
Red Flags
- Total ERR differs by a factor of ~7 between the PDD (89,704 tCO₂e) and the validation report (627,928 tCO₂e); the basis for each figure is not clarified in the extracted record
- No monitoring reports or verification reports are present in the evidence set, so actual emission reductions have never been independently confirmed
- Leakage treatment is inconsistent: the PDD states leakage was 'deemed negligible' while an appendix describes it as 'quantified', and no quantified value is provided
- Additionality test type is recorded as 'combined' but explicit VVB confirmation of the additionality assessment is not found in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 139,764 | 0 | 139,764 | |
| 2009 | 118,518 | 0 | 118,518 | |
| 2010 | 125,868 | 0 | 125,868 | |
| 2011 | 123,192 | 0 | 123,192 | |
| 2012 | 156,443 | 0 | 156,443 | |
| 2013 | 180,498 | 0 | 180,498 | |
| Total | 844,283 | 0 | 844,283 |
Risk Indicators
Combined test present; VVB confirmation not explicitly state
Avoidance project; no inherent reversal risk
0% deduction, 'negligible' vs 'quantified' inconsistency
Jurisdictional grid EF, reassessed at project start (2012)
Safeguards and benefit sharing mentioned; no FPIC or grievan
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →