Skip to main content
CDMHydroChinaACM0002

Gansu Taolaihe Sandaowan Hydropower Project

CDM-6282 ↗

#843of 1935 in Renewable energy#432of 1084 in China#593of 1459 in CDM (UNFCCC)#657of 1287 in ACM0002

5.3/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A small CDM hydropower project in Gansu, China, validated by DNV in 2012 with a combined additionality test and jurisdictional grid baseline. The project's core design is sound for a hydro avoidance project, but the available record is limited to validation-era documents with no monitoring reports or verified emission reductions, and a significant discrepancy exists between the PDD and validation report on total claimed reductions.

Red Flags

  • Total ERR claimed differs by a factor of ~7 between the PDD (2,237,235 tCO2e) and the validation report (319,605 tCO2e), raising data reliability concerns
  • No monitoring reports or verified emission reduction figures are available in the extracted record
  • Extraction confidence is rated low, indicating at least one key document was poorly readable
  • 16 material findings were raised during validation, including questions on financial assumptions, meter accuracy, and stakeholder consultation sufficiency

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test confirmed by DNV

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, deemed negligible — reasonable for hydro

Baseline

Jurisdictional grid EF (0.834, 2007)

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not confi

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents