Gansu Yongdeng Longlin Hydro Power Project
#37of 770 in Renewable energy#15of 204 in China#47of 629 in Verra (VCS)#11of 417 in AMS-I.D
Audit Analysis
A small hydro power project in Gansu, China, verified under VCS methodology AMS-I.D. with confirmed investment additionality and no material findings. The project is a straightforward renewable energy avoidance credit with appropriate monitoring via smart meters, but is undermined by numerous inter-document contradictions, a low extraction confidence rating, and a significant grid emission factor discrepancy between reporting periods.
Red Flags
- Grid emission factor dropped from 0.84125 (2023 verification report) to 0.553575 (2025 monitoring report), a 34% reduction that materially affects credit quantity and warrants explanation of the data source change
- Baseline method is reported as 'project' in the 2023 verification report but 'jurisdictional' in the 2025 monitoring report — an unresolved methodological inconsistency
- Ten contradictions identified across documents, including FPIC, grievance mechanism, safeguards, and benefit-sharing all flipping from false (2022) to true (2025), suggesting earlier documentation gaps were retroactively resolved
- Seven corrective actions were required in the 2025 verification, including revision of the crediting period, methodology designation, and baseline emission calculations
- Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable or incomplete
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 34,113 | 34,113 | 0 | |
| 2012 | 32,299 | 30,419 | 1,880 | |
| 2013 | 34,522 | 34,522 | 0 | |
| 2014 | 22,911 | 7,828 | 15,083 | |
| 2015 | 25,630 | 0 | 25,630 | |
| 2016 | 29,672 | 2,171 | 27,501 | |
| 2017 | 29,556 | 10,170 | 19,386 | |
| 2018 | 33,259 | 33,231 | 28 | |
| 2019 | 36,679 | 9,806 | 26,873 | |
| 2020 | 29,106 | 20,797 | 8,309 | |
| 2021 | 2,534 | 794 | 1,740 | |
| Total | 310,281 | 183,851 | 126,430 |
Risk Indicators
Investment test VVB-confirmed
Avoidance project, no reversal risk
0% deduction, quantified justification
Method contradiction across reports
Present in 2025, absent in 2022
CORSIA excluded, CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →