Gansu Yumen Diwopu Wind Power Project
#365of 1935 in Renewable energy#136of 1084 in China#233of 1459 in CDM (UNFCCC)#270of 1287 in ACM0002
Audit Analysis
A CDM wind power project in Gansu, China, with a jurisdictional baseline and VVB-confirmed additionality, but with notable gaps in monitoring detail, safeguards documentation, and a significant discrepancy between the PDD and validation report on claimed emissions reductions. The project delivered its verified credits without material findings or corrective actions, and the 0% leakage deduction is reasonable for grid-connected wind generation.
Red Flags
- The PDD (June 2019) claims 572,698 tCO2e while the validation report (July 2019) states 81,814 tCO2e — a 7× discrepancy that, while potentially explainable by different crediting-period assumptions, is not reconciled in the available documents
- Additionality is confirmed by the VVB but the specific test type (investment, regulatory, or barrier) is not stated in the extracted record
- No monitoring report is explicitly listed among the evidence documents; the only verification document is the validation report dated October 2019
- CORSIA eligibility and CCP status are both unstated, leaving dual-channel risk unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 34,721 | 0 | 34,721 | |
| 2013 | 166,692 | 0 | 166,692 | |
| Total | 201,413 | 0 | 201,413 |
Risk Indicators
VVB-confirmed but test type unspecified
Avoidance project, no reversals reported
0% deemed negligible, consistent with wind
Jurisdictional, reassessed 2019
Mentioned, benefit-sharing described, FPIC/grievance not doc
CORSIA and CCP status both unstated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →