Gansu Zhouqu County Hujiaai Hydropower Station Project
#1522of 1935 in Renewable energy#962of 1084 in China#1301of 1459 in CDM (UNFCCC)#1161of 1287 in ACM0002
Audit Analysis
A CDM hydro project in Gansu, China, validated by TÜV NORD CERT with a jurisdictional baseline and a 7-year crediting period (2016–2023). The project carries three corrective action requests related to measurement methods and turbine data, and the extracted record lacks confirmation of additionality testing, verified ERR figures, and any monitoring reports, leaving significant evidence gaps. Leakage is treated as negligible (0%), which is reasonable for a small hydro scheme, but the absence of a buffer pool and safeguards documentation weakens the integrity profile.
Red Flags
- Additionality test type and VVB confirmation are not stated in the extracted record, leaving the core CDM additionality requirement unverified in available documents
- Three corrective action requests (CARs) were raised at validation: measurement methods for EGP,J needed elaboration, turbine capacity and coordinates were inconsistent, and parameter CAPpj was not initially monitored
- Total verified ERR is not available in the extracted record, making it impossible to confirm actual credit delivery against the 561,190 tCO2e lifetime claim
- No buffer pool percentage is stated, and no reversal events data is available, leaving permanence risk unquantified
- No FPIC, grievance mechanism, or detailed safeguards documentation is present in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 112,812 | 0 | 112,812 | |
| 2012 | 145,673 | 0 | 145,673 | |
| 2013 | 103,813 | 0 | 103,813 | |
| Total | 362,298 | 0 | 362,298 |
Risk Indicators
Test type and VVB confirmation not stated in extracted recor
no reversal data available
0% deemed negligible — reasonable for small hydro
Jurisdictional baseline, reassessed 2016
Safeguards mentioned but no FPIC or grievance mechanism docu
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →