Gazi-9 WPP
GS-2586 ↗ · current registry ID: GS7741
#140of 295 in Turkey#373of 1801 in Gold Standard (GS)#526of 1287 in ACM0002
Audit Analysis
Gazi-9 WPP is a Gold Standard wind project in Turkey with VVB-verified additionality and no reversal events, but is undermined by a material finding that the first crediting period began a year before design certification, a baseline-method contradiction between the verification and monitoring reports, and a 0% leakage deduction whose justification is inconsistent across documents. The project over-delivered relative to its pro-rata expectation, reducing over-crediting risk, yet several key transparency fields remain unreported and the primary source file appears corrupted.
Red Flags
- Material finding in the verification report: the first crediting period start date (10 Aug 2021) predates the design certification date (10 Aug 2022) by one full year, with no corrective action recorded.
- Baseline method is reported as 'project' in the verification report but 'jurisdictional' in the monitoring report — a direct contradiction that affects baseline validity.
- Leakage justification is 'quantified' in the verification report but 'deemed negligible' in the monitoring report, despite both documents being dated 25 Aug 2025.
- The primary source file is described in its own summary as potentially corrupted or containing primarily non-textual data, undermining confidence in the extracted figures.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2022 | 71,483 | 0 | 71,483 | |
| 2023 | 127,268 | 0 | 127,268 | |
| 2024 | 52,714 | 0 | 52,714 | |
| Total | 251,465 | 0 | 251,465 |
Risk Indicators
VVB-verified combined test
Avoidance project, no reversals
0% deduction, inconsistent justification
Method contradicts across reports
Grievance & benefit-sharing present, no FPIC
CCP & CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →