Skip to main content
CDMBiomass EnergyIndiaAMS-I.D

GCL biomass gasification based power generation

CDM-1760 ↗

#162of 352 in Biomass#736of 975 in India#1099of 1459 in CDM (UNFCCC)#443of 806 in AMS-I.D

4.6/ 10
Integrity
5.5
Transparency
3.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A CDM biomass gasification power project in India with VVB-confirmed additionality (combined test) and a reasonable Indian grid emission factor, but limited by a project-specific baseline, a 0% leakage deduction with only a generic 'quantified' justification, and a near-total absence of monitoring-period verification data. The low extraction confidence and lack of any verified ERR figures significantly constrain confidence in the project's actual performance.

Red Flags

  • No monitoring-period data or verified ERR figures found in any available document — actual credit delivery cannot be assessed
  • 0% leakage deduction justified only by the single word 'quantified' with no supporting calculation or methodology detail in the extracted record
  • Low extraction confidence across the document set, meaning key compliance details may be missing from the analysis
  • 4 Corrective Action Requests raised during validation (though all subsequently closed)

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification only 'quantified'

Baseline

Project-specific, no reassessment date

Safeguards

Safeguards mentioned, benefit sharing described, but FPIC an

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents