Gelinkaya HPP
#768of 1935 in Renewable energy#12of 75 in TR#17of 154 in Intl. Carbon Registry (ICR)#266of 806 in AMS-I.D
Audit Analysis
Gelinkaya HPP is a Turkish hydropower avoidance project under the ICR registry with a jurisdictional baseline, investment additionality test, and no reported reversals. However, the project delivered only about 38% of its ex-ante lifetime estimate over the full 10-year crediting period, and several key verification and monitoring details (VVB identity, FNRB, usage rates) are absent from the extracted record. A contradiction in the claimed ERR between two PDD revisions (54,795 vs 14,324) introduces data-reliability uncertainty.
Red Flags
- Contradiction in total ERR claimed: 54,795 (PDD, 2025-09-02) vs 14,324 (PDD, 2025-08-27) — a 3.8× discrepancy within the same document type, raising questions about data reliability
- Verified ERR (54,795) is only 38.3% of the ex-ante lifetime estimate (143,242) over the full 10-year crediting period, indicating the ex-ante assumptions were substantially optimistic
- VVB name and additionality verification status are not stated in the extracted record, leaving the independence of the additionality assessment unconfirmed
- Four corrective actions are outstanding, including completion of the ICR ESES Tool and re-submission of documentation under v6.0 templates
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 7,888 | 0 | 7,888 | |
| 2014 | 14,324 | 0 | 14,324 | |
| 2015 | 14,324 | 0 | 14,324 | |
| 2016 | 14,324 | 0 | 14,324 | |
| 2017 | 14,324 | 0 | 14,324 | |
| 2018 | 14,324 | 0 | 14,324 | |
| 2019 | 14,324 | 0 | 14,324 | |
| 2020 | 14,324 | 0 | 14,324 | |
| 2021 | 14,324 | 0 | 14,324 | |
| 2022 | 14,324 | 0 | 14,324 | |
| 2023 | 6,436 | 0 | 6,436 | |
| Total | 143,240 | 0 | 143,240 |
Risk Indicators
Investment test identified but VVB verification not stated
Avoidance HPP, 0% permanence risk, no reversals
0% deduction, deemed negligible — reasonable for grid-displacement HPP
Jurisdictional baseline, but last reassessment date not stated
FPIC, grievance mechanism, and benefit-sharing all documented
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →