Skip to main content
CDMWindIndiaAMS-I.D

Generation of electricity from 3.3 MW installed capacity wind mills by Mission Biofuels India Private Limited (MBIPL), in Sangli District, Maharashtra, India

CDM-2710 ↗

#18of 352 in Biomass#223of 975 in India#279of 1459 in CDM (UNFCCC)#158of 806 in AMS-I.D

5.9/ 10
Integrity
6.2
Transparency
5.2
Claim Safety
6.8
Documentation
5.0

Audit Analysis

A small-scale CDM wind project (3.3 MW) in Maharashtra, India, verified by DNV with a jurisdictional grid-emission-factor baseline. The project delivered roughly 69% of its pro-rata expectation in the first monitoring period, indicating conservative crediting, but seven material findings—including incomplete additionality evidence and metering gaps—temper confidence in the underlying data quality.

Red Flags

  • Material finding CAR #7: additionality arguments lacked appropriate evidence and financial calculations were incomplete, despite VVB sign-off
  • Meters for parameters EGF13,S and EGF12,S were not available at the wind farm site, raising questions about the accuracy of generation data
  • Only a monitoring report (2011) and validation report (2010) are in the evidence set; no verification report or post-2011 monitoring data is available
  • Baseline method is described as 'project' in the validation report but 'jurisdictional' in the monitoring report, creating ambiguity about the actual baseline approach

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed but evidence gaps flagged

Permanence

Avoidance project, no reversal risk

Leakage

0% justified for wind, no feedstock

Baseline

Jurisdictional grid EF, method contradiction

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-29AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents