Generation of electricity from 9.6 MW capacity wind mills by Sun-n-Sand Hotels Pvt. Ltd. at Bhambarwadi, Maharashtra
#160of 975 in India#195of 1459 in CDM (UNFCCC)#116of 806 in AMS-I.D
Audit Analysis
A 9.6 MW CDM wind project in Maharashtra with a VVB-confirmed investment additionality test and a jurisdictional grid baseline. The project is technically straightforward, but a high number of corrective action requests during verification, a dated 2007 grid emission factor, and an internal contradiction in claimed emission reduction figures temper confidence in the credit volume.
Red Flags
- 13 Corrective Action Requests and 8 Clarification Requests were raised during verification, indicating a non-trivial number of issues that had to be resolved before credit issuance.
- The monitoring report contains an internal contradiction on total claimed emissions reductions (43,335 vs 31,652 tCO2e), undermining confidence in the reported credit volume.
- The grid emission factor of 0.9064 tCO2/MWh is drawn from 2007 data; India's grid mix has shifted since then, so the baseline may overstate the displacement benefit.
- The monitoring report is dated September 2022 but covers a monitoring period ending December 2015, a gap of nearly seven years that raises questions about timeliness of MRV reporting.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 8,940 | 0 | 8,940 | |
| 2010 | 14,433 | 0 | 14,433 | |
| 2011 | 12,945 | 0 | 12,945 | |
| 2012 | 14,208 | 0 | 14,208 | |
| 2013 | 12,216 | 0 | 12,216 | |
| 2023 | 74,972 | 0 | 74,972 | |
| Total | 137,714 | 0 | 137,714 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
Quantified, deemed negligible (0%)
Jurisdictional but 2007 grid EF, no reassessment stated
Mentioned; FPIC and grievance details not found
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →