Germiyan Wind Power Project, Turkey

VCS-1438 ↗

#110of 1935 in Renewable energy#26of 295 in Turkey#42of 1339 in Verra (VCS)#78of 1287 in ACM0002

6.6/ 10
Integrity
7.0
Transparency
6.5
Claim Safety
7.0
Documentation
5.5

Audit Analysis

The Germiyan Wind Power Project is a straightforward renewable energy avoidance project with VVB-confirmed additionality, no reversal events, and a reasonable grid-emission-factor baseline. However, a material finding on generation data (a ~26% discrepancy between two sections of the monitoring report), nine cross-document contradictions, and low extraction confidence in at least one key document temper an otherwise solid profile. The project is mid-crediting-period with no over-claiming detected in the final verified figures.

Red Flags

  • Material finding: generation figure of 45,588 MWh in MR Section 1.11 conflicts with ~36,068 MWh in the spreadsheet/PDD — a ~26% discrepancy that was flagged as a typo but warrants scrutiny of the underlying data pipeline
  • Nine contradictions across documents, including baseline method ('project' in the verification report vs 'jurisdictional' in the monitoring report) and safeguards/FPIC status (confirmed in the 2024 verification report but absent in the 2015 validation report)
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted record
  • Buffer pool percentage not stated in any available document, leaving permanence risk unquantified even though wind projects carry minimal reversal risk

Credit Vintages

IssuedRetiredAvailable
2016
14,21014,2100
2017
21,64521,6450
2018
19,86019,8600
2019
21,10521,1050
2020
21,87821,8780
2021
24,5015,04819,453
2022
23,644023,644
2023
20,341020,341
2024
4,77404,774
Total171,958103,74668,212

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals

Leakage

0% with quantified justification

Baseline

Method contradiction; 2011 grid EF

Safeguards

Confirmed in VR, absent in 2015 VR

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents