Skip to main content
VCSavoidanceTurkeyVintage 2018, 2019, 2021 Registry: RegisteredAMS-I.D

Gezin Solar Power Project

VCS-1870 ↗

#366of 1935 in Renewable energy#80of 295 in Turkey#187of 1339 in Verra (VCS)#136of 806 in AMS-I.D

6.0/ 10
Integrity
5.2
Transparency
6.5
Claim Safety
6.5
Documentation
6.0

Audit Analysis

The Gezin Solar Power Project is a VCS-registered renewable energy avoidance project in Turkey with a jurisdictional baseline and VVB-confirmed additionality. The verified ERR (13,936 tCO₂e) is slightly below the claimed figure (14,346), indicating conservative reporting. However, the absence of a stated buffer pool, unspecified additionality test type, and a large number of validation-stage corrective actions (23 CARs, 13 CLs) temper confidence in the project's methodological robustness.

Red Flags

  • 23 Corrective Action Requests and 13 Clarification Requests were raised during validation, indicating significant initial documentation and methodological gaps (all resolved, but the volume is notable)
  • CORSIA eligibility and CCP status are not stated in any extracted document, leaving dual-channel risk unassessed
  • Contradiction between the verification report (leakage 'quantified') and the monitoring report (leakage 'deemed negligible') on the same date suggests inconsistent internal reporting

Credit Vintages

IssuedRetiredAvailable
2018
2,9349611,973
2019
3,7142,3281,386
2020
8,3108,3100
2021
3,08513,084
Total18,04311,6006,443

Risk Indicators

Additionality

VVB-confirmed

Permanence

Avoidance – no reversal risk

Leakage

0% – quantified, appropriate for solar

Baseline

Jurisdictional, not yet due for reassessment

Safeguards

Grievance mechanism present; FPIC not stated

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents