Gimhae PV(photovoltaic) Power Plant Project
#1310of 1935 in Renewable energy#16of 24 in South Korea#1036of 1459 in CDM (UNFCCC)#423of 806 in AMS-I.D
Audit Analysis
The Gimhae solar PV project (CDM-4048) is a straightforward grid-displacement project with a confirmed investment-test additionality and jurisdictional baseline, but the validation report surfaced nine material findings including a baseline emission-factor miscalculation and an unresolved ODA/public-funding question. Two numerical contradictions between the PDD and the validation report (a 10× ERR discrepancy and a grid-EF mismatch) reduce confidence in the underlying data, and no post-issuance monitoring data is available in the extracted record.
Red Flags
- Ten-fold discrepancy in total ERR between the PDD (12,470) and the validation report (1,247), likely a unit or decimal error but indicating weak internal consistency
- Validation report CAR 2 flags that the baseline emission factor was miscalculated because Ulsan plant fuel consumption was wrongly described
- CL 3: no evidence submitted that project financing excludes ODA or public funding from Annex I countries, undermining the investment-test additionality
- No monitoring-period data or verified ERR figures found in any available document despite the crediting period having ended in November 2020
- Low extraction confidence across the document set, meaning key fields may be missing or misread
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test VVB-confirmed, but ODA/public funding not ex
Solar PV avoidance project; inherent reversal risk is minima
0 % deduction deemed negligible; reasonable for grid-displac
Jurisdictional method is sound, but baseline EF miscalculati
Safeguards mentioned and benefit sharing described, but no F
CORSIA eligibility and CCP status not stated in any availabl
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →