Skip to main content
GSPVDominican RepublicACM0002

Girasol Solar Power Plant

GS-4306 ↗ · current registry ID: GS12339

#1014of 1935 in Renewable energy#5of 6 in Dominican Republic#720of 1801 in Gold Standard (GS)#798of 1287 in ACM0002

5.1/ 10
Integrity
5.5
Transparency
4.8
Claim Safety
5.0
Documentation
4.8

Audit Analysis

The Girasol Solar Power Plant is a 5-year Gold Standard PV avoidance project in the Dominican Republic with VVB-confirmed additionality and no reversal events, but it is undermined by a contradiction in baseline method (project-specific vs. jurisdictional), an unaddressed leakage justification, a grid emission factor from 2020 whose validity is under corrective action, and an exact match between claimed and verified ERR that raises transparency concerns. The project appears to be a CDM-era installation (PDD dated 2017) re-verified under Gold Standard, adding documentation complexity.

Red Flags

  • Claimed and verified ERR are identical (204,060 tCO₂e) with no ex-ante lifetime figure available, making independent verification of the magnitude unverifiable
  • Grid emission factor of 0.6216 tCO₂/MWh is from 2020 and its continued validity is subject to a corrective action (FAR 01), creating baseline uncertainty
  • Leakage justification is contradictory: the verification report (July 2025) records it as 'not addressed' while the monitoring report (April 2025) states it was 'deemed negligible', with no quantified deduction
  • Baseline method is contradictory: the verification report classifies it as project-specific while the monitoring report calls it jurisdictional, and no reassessment date is recorded
  • Multiple corrective actions remain open, including GEF validity under the selected methodology, stakeholder consultation documentation gaps, and calibration certificate coverage

Credit Vintages

IssuedRetiredAvailable
2022
82,444082,444
2023
121,6160121,616
Total204,0600204,060

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, justification inconsistent

Baseline

Project-specific, GEF under review

Safeguards

Grievance present, FPIC not conducted

Double-claim

CCP and CORSIA status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-04ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents