Audit Analysis
Glanris is a Puro.earth biochar removal project in the United States with verified additionality and a 100-year permanence claim, but the verification report surfaced three material findings (including an initial H/Corg ratio breach and a bulk-density calculation error) and two corrective actions. The absence of a stated buffer pool, leakage treatment, and baseline methodology for a long-lived removal credit leaves meaningful gaps in the integrity and claim-safety picture.
Red Flags
- 100-year permanence claim with no buffer pool percentage stated in any available document, leaving reversal risk unmitigated
- No leakage deduction or leakage justification found in the extracted record for a biochar project where displaced soil carbon or feedstock substitution effects are plausible
- Three material findings in the verification report, including an initial H/Corg ratio of 0.70 exceeding the <0.7 threshold (corrected to 0.34 in a follow-up lab report) and a bulk-density calculation error that under-quantified one CORC
- Baseline method and baseline reassessment date are not stated in any available document
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 82 | 82 | 0 | |
| Total | 82 | 82 | 0 |
Risk Indicators
VVB-confirmed
mixed evidence / unresolved risk
No deduction or justification found
Method and reassessment not stated
Mentioned but FPIC and grievance mechanism not confirmed
CORSIA and CCP status not stated
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →