A CDM solar PV project in Israel with a VVB-verified investment additionality test and a reasonable zero-leakage justification for grid-displacement, but severely limited by the complete absence of monitoring reports, verified emissions data, and any post-validation documentation. Three contradictions between the PDD and the validation report on baseline method, additionality test type, and leakage treatment introduce data-reliability concerns that temper confidence in the project's design assumptions.
Red Flags
- No monitoring reports or verified ERR figures are available in the extracted record, making it impossible to confirm actual delivery against the 646,846 tCO2e lifetime claim
- Three contradictions between the PDD (Nov 2010) and the validation report (Dec 2010) on baseline method (project vs jurisdictional), additionality test type (investment vs combined), and leakage treatment (deemed negligible vs quantified) indicate inconsistent project documentation
- Four material findings at validation, including pending Letters of Approval from all parties and unverified financial and generation parameters, were noted in the validation report
- Grid emission factor of 0.771 tCO2/MWh is dated to 2008 with no evidence of update or reassessment during the 2012–2022 crediting period
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal risk
0% deduction, reasonable for grid solar
Project-specific per VVB, contradicts PDD
Grievance & safeguards noted, FPIC absent
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →