Goldwind Damao Wind Farm Project
#17of 1935 in Renewable energy#2of 1084 in China#10of 1459 in CDM (UNFCCC)#8of 1287 in ACM0002
Audit Analysis
The Goldwind Damao Wind Farm is a standard CDM wind project with a VVB-confirmed combined additionality test, a jurisdictional grid-emission-factor baseline, and no reversal or leakage concerns. The project over-delivered relative to its pro-rata expectation for the monitored period, and all material findings from validation were resolved without corrective actions. The main residual concern is the reliance on a 2005 grid emission factor, which may overstate abatement if the Chinese grid has since decarbonised.
Red Flags
- Grid emission factor of 1.058 tCO₂/MWh is drawn from 2005 data; if the Chinese grid has become cleaner since, the baseline may overstate actual abatement.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
- Crediting period start date differs between the 2008 validation report (1 Nov 2008) and the 2016 monitoring report (13 Aug 2009), creating ambiguity about the exact crediting window.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2010 | 72,831 | 0 | 72,831 | |
| 2011 | 87,025 | 0 | 87,025 | |
| 2014 | 217,488 | 0 | 217,488 | |
| 2016 | 434,429 | 0 | 434,429 | |
| Total | 811,773 | 0 | 811,773 |
Risk Indicators
VVB-confirmed combined test
Wind avoidance – no reversal risk
Negligible, justified for grid displacement
Jurisdictional but 2005 grid EF; minor doc contradiction
Mentioned and benefit sharing described; FPIC/grievance not
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →