Green Power Generation Project
#815of 975 in India#1240of 1459 in CDM (UNFCCC)#501of 806 in AMS-I.D
Audit Analysis
A CDM wind power project in India validated under the simplified AMS I.D methodology with a jurisdictional grid baseline and VVB-confirmed investment additionality. However, the available record is limited to validation-stage documents, a 10× discrepancy in claimed emissions reductions between the PDD and validation report raises over-crediting concerns, and ten corrective action requests at validation indicate significant initial PDD quality issues.
Red Flags
- Emissions reduction figure differs by a factor of 10 between the PDD (161,280 tCO₂) and the validation report (16,128 tCO₂), creating material uncertainty about the true credit volume
- Ten corrective action requests were raised at validation, covering unclear baseline scenarios, missing monitoring plan details (meter accuracy, calibration, QA/QC), and misalignment with AMS I.D v17 requirements
- No monitoring reports or verification reports were found in the available document set, leaving actual performance unverified
- Leakage treatment is inconsistent: the validation report states 'deemed negligible' while a financial document references a 'quantified' approach
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Investment test, VVB-confirmed
Avoidance project, no reversal risk
0% deemed negligible, minor doc inconsistency
Jurisdictional grid EF, standard for wind
Mentioned, benefit sharing described, FPIC/grievance not sta
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →