Greenfield power project at Dwarikesh Dham

CDM-1339 ↗

#58of 352 in Biomass#384of 975 in India#545of 1459 in CDM (UNFCCC)#9of 81 in ACM0006

5.4/ 10
Integrity
5.5
Transparency
5.5
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A CDM biomass energy project (bagasse power at a sugar mill) with VVB-confirmed additionality and a reasonable 81% verified-to-claimed delivery ratio, but undermined by a project-specific baseline, 23 corrective actions flagged in the PDD, and several key MRV parameters (FNRB, usage monitoring, buffer pool) left unstated in the available record.

Red Flags

  • 23 corrective actions were required on the PDD, spanning additionality documentation, baseline scenario corrections, monitoring plan gaps, and data-source issues — indicating the original submission had substantial methodological weaknesses
  • FNRB value, usage monitoring method, and buffer pool percentage are all absent from the extracted record, leaving key MRV and permanence parameters unverifiable
  • Crediting period dates differ between the PDD (2007-11-09 to 2017-11-09) and the 2012 monitoring report (2008-02-01 to 2018-01-31), creating ambiguity about the actual registration window

Credit Vintages

IssuedRetiredAvailable
2009
6,94706,947
2010
8,93508,935
2011
50,913050,913
2013
30,414030,414
Total97,209097,209

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

low inherent risk for energy project

Leakage

0% deemed negligible; thin justification

Baseline

Project-specific; 2006 grid EF

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0006

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents