Greenzone Reforestation Project
#228of 261 in Soil carbon#9of 9 in Cameroon#1271of 1339 in Verra (VCS)#90of 97 in AR-ACM0003
Audit Analysis
The Greenzone Reforestation Project in Cameroon is a registered VCS AFOLU project with a 40-year crediting period, but the validation report identifies 31 material findings spanning baseline consistency, additionality analysis, leakage justification, and documentation compliance. The zero-leakage claim is explicitly flagged as insufficiently justified for a reforestation project in a region where agricultural displacement is a well-known risk, and the ex-ante emissions reduction figures show a 13-fold discrepancy between the PDD and the validation report. No monitoring or verification data is available, and the low extraction confidence further limits the evidentiary basis for scoring.
Red Flags
- 31 material findings in the validation report, including inconsistent baseline land-use descriptions, incomplete additionality analysis, and misaligned ex-ante ER estimation methods
- Zero leakage deduction explicitly flagged as insufficiently justified; corrective action requires evidence that agriculture is not displaced in a reforestation project in Cameroon
- 13-fold discrepancy in lifetime ex-ante ERR between the PDD (105 tCO2e) and the validation report (1,390 tCO2e)
- No legally binding commitment documented for the 40-year project longevity
- No monitoring or verification reports available; total verified ERR is not stated in any document
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-verified but analysis gaps
Buffer present, commitment missing
Zero deduction, justification insufficient
Project-specific, inconsistencies noted
FPIC and grievance present, validation unclear
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →