Grid connected bundled wind power project in Gujarat managed by Enercon (India) Limited
#729of 1935 in Renewable energy#355of 975 in India#437of 1339 in Verra (VCS)#570of 1287 in ACM0002
Audit Analysis
A long-running grid-connected wind project in Gujarat with a sound jurisdictional baseline and VVB-verified investment additionality, but burdened by an extensive list of material findings (calibration delays, missing data, an unaddressed Great Indian Bustard threat) that were closed out. The project delivered roughly 66% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative crediting. Low extraction confidence and several null fields (CORSIA, CCP, FNRB) limit the depth of assurance.
Red Flags
- Threat to the Great Indian Bustard (a critically endangered species) was not addressed in the monitoring report (CL#08), raising a significant biodiversity concern for a Gujarat wind project.
- Meter calibration at the Bhogat substation was delayed beyond the registered frequency (last calibrated 2013/2016, next due 2021), requiring a 0.2% correction factor and casting doubt on the precision of generation data.
- 30+ material findings, 8 CARs, 9 CRs, and 1 FAR were raised across verification cycles, indicating persistent monitoring and documentation quality issues despite all being closed.
- CORSIA eligibility and CCP status are not stated in any available document, leaving the double-claiming risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2008 | 24,194 | 24,094 | 100 | |
| 2009 | 26,003 | 26,003 | 0 | |
| 2010 | 24,109 | 24,109 | 0 | |
| 2011 | 23,940 | 23,940 | 0 | |
| 2012 | 24,978 | 24,978 | 0 | |
| 2013 | 5,579 | 5,579 | 0 | |
| 2017 | 21,085 | 21,085 | 0 | |
| 2018 | 23,270 | 23,270 | 0 | |
| 2019 | 23,973 | 23,973 | 0 | |
| 2020 | 19,654 | 19,183 | 471 | |
| 2021 | 23,799 | 22,327 | 1,472 | |
| Total | 240,584 | 238,541 | 2,043 |
Risk Indicators
VVB-confirmed investment test
Wind power – no reversal risk
0% – negligible for grid feed-in
Jurisdictional, reassessed 2018
FPIC & grievance present; Bustard threat unaddressed
CORSIA & CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →