Skip to main content
CDMWindIndiaAMS-I.D

Grid Connected Bundled Wind Power Project in Jaisalmer, Rajasthan, India

CDM-5646 ↗

#434of 1935 in Renewable energy#224of 975 in India#280of 1459 in CDM (UNFCCC)#159of 806 in AMS-I.D

5.9/ 10
Integrity
7.2
Transparency
5.0
Claim Safety
6.0
Documentation
4.2

Audit Analysis

A small-scale CDM wind project in Jaisalmer with a VVB-verified investment additionality test and jurisdictional baseline, but limited documentation (no monitoring or verification reports found) and a notable discrepancy in claimed emission reductions between the PDD and validation report. The project is an avoidance-type wind installation with low permanence and leakage risk, but the overall evidence base is thin and extraction confidence is low.

Red Flags

  • ERR contradiction: PDD (2011-12-13) states 161,260 tCO2 while the validation report (2011-12-17) and verified figure both state 16,126 tCO2 — a factor-of-ten discrepancy that, while resolvable in favour of the VVB-verified figure, raises data-reliability concerns
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete
  • No monitoring or verification reports found in the available record; only the 2011 validation report provides substantive evidence
  • 13 material findings (9 CARs + 4 CLs) raised during validation, including missing DNA approval, inconsistent financial analysis, and incomplete monitoring plan — all resolved but indicative of a weak initial submission

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind avoidance – no reversal risk

Leakage

0% deemed negligible – appropriate for grid wind

Baseline

Jurisdictional baseline, grid EF 0.9224 (2009)

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents