Grid Connected Bundled Wind Power Project in Karnataka and Maharashtra
GS-1022 ↗ · current registry ID: GS5831
#326of 1935 in Renewable energy#171of 975 in India#143of 1801 in Gold Standard (GS)
Audit Analysis
A grid-connected wind power project in India with a sound avoidance-based design and VVB-confirmed additionality, but undermined by five corrective action requests, a grid emission factor frozen at 2012 values, and several missing operational documents (PPA, O&M agreements, grievance records). The project over-delivered relative to its pro-rata expectation in the 2024 monitoring period, and no reversal events were reported, but the documentation gaps and data inconsistencies lower confidence in the overall record.
Red Flags
- Five Corrective Action Requests issued by the VVB, including missing PPA, O&M agreements, commissioning certificates, and grievance records
- Grid emission factor of 0.95827 tCO2/MWh is from 2012 and has not been updated despite the project operating since 2017
- Monitoring report contains internal inconsistencies in SDG benefit values, methodology version references, and missing meter calibration details
- CORSIA eligibility and CCP status are not stated in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 3,888 | 0 | 3,888 | |
| 2019 | 23,359 | 0 | 23,359 | |
| 2020 | 18,895 | 0 | 18,895 | |
| Total | 46,142 | 0 | 46,142 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deduction, deemed negligible but not quantified
Jurisdictional but grid EF frozen at 2012
FPIC and grievance mechanism present but records missing
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →