Grid Connected Bundled Wind Power Project in Karnataka and Maharashtra

GS-1022 ↗ · current registry ID: GS5831

#326of 1935 in Renewable energy#171of 975 in India#143of 1801 in Gold Standard (GS)

6.0/ 10
Integrity
6.5
Transparency
5.5
Claim Safety
6.5
Documentation
4.5

Audit Analysis

A grid-connected wind power project in India with a sound avoidance-based design and VVB-confirmed additionality, but undermined by five corrective action requests, a grid emission factor frozen at 2012 values, and several missing operational documents (PPA, O&M agreements, grievance records). The project over-delivered relative to its pro-rata expectation in the 2024 monitoring period, and no reversal events were reported, but the documentation gaps and data inconsistencies lower confidence in the overall record.

Red Flags

  • Five Corrective Action Requests issued by the VVB, including missing PPA, O&M agreements, commissioning certificates, and grievance records
  • Grid emission factor of 0.95827 tCO2/MWh is from 2012 and has not been updated despite the project operating since 2017
  • Monitoring report contains internal inconsistencies in SDG benefit values, methodology version references, and missing meter calibration details
  • CORSIA eligibility and CCP status are not stated in any available document

Credit Vintages

IssuedRetiredAvailable
2018
3,88803,888
2019
23,359023,359
2020
18,895018,895
Total46,142046,142

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Avoidance project, no reversals

Leakage

0% deduction, deemed negligible but not quantified

Baseline

Jurisdictional but grid EF frozen at 2012

Safeguards

FPIC and grievance mechanism present but records missing

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents