Skip to main content
CDMWindIndiaACM0002

Grid-connected electricity generation from renewable sources at Kadavakallu, Putluru Mandal, Dist.

CDM-1071 ↗

#10of 975 in India#11of 1459 in CDM (UNFCCC)#9of 1287 in ACM0002

7.1/ 10
Integrity
7.5
Transparency
6.5
Claim Safety
7.0
Documentation
7.5

Audit Analysis

A 13.5 MW wind project in Andhra Pradesh, India, registered under CDM with a combined additionality test confirmed by SGS UK and a jurisdictional grid baseline. The project is an avoidance-type with no inherent reversal risk, and the 0% leakage deduction is appropriate for grid-connected generation. The main concern is an apparent discrepancy between the 167,550 CERs issued in 2008 and the 30,826 ERR reported in the 2011 monitoring report, which most likely reflects two separate monitoring periods but creates a data-reliability question.

Red Flags

  • The monitoring report (2011) reports 30,826 tCO2 ERR while the issuance document (2008) records 167,550 CERs; although these likely cover different monitoring periods, the overlap in stated dates (monitoring period begins 2007-07-22) raises a potential double-counting question that is not explicitly resolved in the available documents.
  • The grid emission factor of 0.81 tCO2/MWh is sourced from 2005 data and no baseline reassessment date is recorded in the extracted record, leaving the currency of the baseline unverified.

Credit Vintages

IssuedRetiredAvailable
2008
109,8790109,879
2014
30,942030,942
Total140,8210140,821

Risk Indicators

Additionality

Combined test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

0% deemed negligible, appropriate

Baseline

Jurisdictional, 2005 grid EF, no reassessment recorded

Safeguards

Mentioned but FPIC/grievance not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents