Skip to main content
VCSEnergy industries (renewable/non-renewable sources)India Registry: RegisteredAMS-I.D

Grid Connected Renewable Power Generation from Wind Mills by L.S Mills

VCS-749 ↗

#478of 975 in India#592of 1339 in Verra (VCS)#310of 806 in AMS-I.D

5.2/ 10
Integrity
5.0
Transparency
5.5
Claim Safety
5.5
Documentation
4.5

Audit Analysis

A grid-connected wind power project in India with a confirmed investment additionality test and jurisdictional baseline, but undermined by six material findings, seventeen or more corrective actions, an internally contradictory leakage justification, and the absence of FPIC or a grievance mechanism. The project is past its crediting period and the documentation record, while extensive, shows significant quality gaps and inter-document inconsistencies.

Red Flags

  • Six material findings in the 2021 verification report, including missing commissioning certificates, calibration records, PPA, and a no-double-counting undertaking
  • Leakage justification is internally contradictory within the same 2021 verification report: one section states 'not addressed' while another states 'deemed negligible'
  • Baseline method is described as 'jurisdictional' in the 2021 verification report but 'project-specific' in the 2009 validation report
  • No FPIC conducted and no grievance mechanism in place, despite safeguards being mentioned in the 2021 verification report
  • Seventeen or more corrective actions (CAR-01 through CAR-06, CAR 3.2.1–3.2.4, CAR 3.3.1) remain outstanding

Credit Vintages

IssuedRetiredAvailable
2006
13,6451,03612,609
2007
20,589020,589
2008
16,802016,802
2010
21,91021,9100
2011
1,1841,1840
2012
21,11220,934178
2013
18,54317,548995
2014
16,22516,2250
2015
12,09712,0970
2016
6916910
Total142,79891,62551,173

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

Wind – no reversal risk

Leakage

0% deduction, contradictory justification

Baseline

Jurisdictional per 2021 VR, contradicted by 2009 VR

Safeguards

No FPIC, no grievance mechanism

Double-claim

CORSIA excluded; CCP not stated; no DC undertaking submitted

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents