A grid-connected solar PV project in Jodhpur with a jurisdictional baseline and VVB-confirmed additionality, but the record is weakened by 12 material findings in the PDD, the absence of a verified ERR figure, and an unconfirmed additionality test type. The project is inherently low-risk on permanence (no reversal mechanism in solar PV) and leakage (grid-connected displacement), but documentation quality and MRV transparency fall short of best practice.

Red Flags

  • Twelve material findings and corrective actions were raised during validation, including mismatched solar panel specifications, a missing Host Country Approval letter, and use of an outdated CEA emission-factor database (v6 instead of v7)
  • The verified ERR figure is not present in the extracted record, making it impossible to confirm actual delivery against the 59,865 tCO₂ claimed over the 7-year crediting period
  • The additionality test type (investment, regulatory, or barrier) is not stated in any available document, despite VVB confirmation

Credit Vintages

IssuedRetiredAvailable
2022
59,549059,549
Total59,549059,549

Risk Indicators

Additionality

VVB-confirmed but test type not stated

Permanence

Solar PV – no reversal mechanism

Leakage

0% deduction, physically reasonable for grid PV

Baseline

Jurisdictional grid EF, 2012 CEA data

Safeguards

Mentioned but FPIC and grievance mechanism not documented

Double-claim

CORSIA and CCP status not stated

Where to buy

Marketplaces

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents