Grid Connected Solar PV Project by M/s. Giriraj Enterprises in Maharashtra

CDM-10017 ↗

#1170of 1935 in Renewable energy#608of 975 in India#893of 1459 in CDM (UNFCCC)#378of 806 in AMS-I.D

4.9/ 10
Integrity
6.0
Transparency
4.0
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A grid-connected solar PV project in Maharashtra validated under CDM AMS-I.D v18 with a VVB-confirmed combined additionality test and a jurisdictional baseline. However, the validation report carried four corrective actions (missing technical documents, boundary inconsistency, a rounding error in baseline emissions, and absent monitoring records), and the available record contains no monitoring reports, no FNRB or usage-rate data, and a significant presentation discrepancy between the PDD and validation report on total emissions. The project is structurally sound for a solar avoidance credit but the documentation and data trail are thin.

Red Flags

  • The PDD (2021-03-31) reports a total ERR of 64,746 tCO₂e while the validation report (2021-04-13) reports 9,249 tCO₂e — a 7× gap that, while likely reflecting a lifetime-vs-annual basis difference, was not reconciled in the documents and undermines data reliability.
  • Four corrective actions were required at validation, including a rounding error in the baseline emissions calculation (CAR 03) and an inconsistent project-boundary demonstration relative to AMS-I.D v18 (CAR 02), indicating the project documentation was not fully compliant at the time of validation.
  • No monitoring reports, monitoring period, FNRB method, usage-rate data, or CORSIA/CCP eligibility information were found in the extracted record, leaving the post-validation performance and market-eligibility picture entirely unverified.

Credit Vintages

IssuedRetiredAvailable
2022
59,088059,088
Total59,088059,088

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Avoidance project, no reversal risk

Leakage

Negligible, justified for grid-connected solar

Baseline

Jurisdictional per VVB, but appendix discrepancy and roundin

Safeguards

Safeguards mentioned; FPIC and grievance mechanism not state

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents