Grid Connected Solar PV Project by M/s. Giriraj Enterprises in Rajasthan
#140of 1935 in Renewable energy#67of 975 in India#84of 1459 in CDM (UNFCCC)#99of 1287 in ACM0002
Audit Analysis
A standard CDM grid-connected solar PV project in Rajasthan using the well-established ACM0002 methodology, with a VVB-confirmed combined additionality test and a jurisdictional grid-emission-factor baseline. The project is in the early stage of its seven-year crediting period, so no monitoring data is yet available, and several operational parameters (FNRB, usage rate, monitoring method) remain unstated. One minor material finding on energy calculation was raised and closed without corrective action.
Red Flags
- No monitoring or verification reports are available; all performance data is limited to the ex-ante validation estimate of 283,221 tCO2e.
- FNRB value, usage monitoring method, and usage rate are all unstated in the available documents, leaving the operational assumptions behind the ERR unverified.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 285,251 | 0 | 285,251 | |
| Total | 285,251 | 0 | 285,251 |
Risk Indicators
Combined test, VVB-confirmed
Avoidance project, no reversal risk
0% deemed negligible, justified
Jurisdictional grid EF, reassessed 2023
Mentioned but FPIC and grievance mechanism not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →