Grid-connected Solar PV project in Kael

GS-2766 ↗ · current registry ID: GS10809

#612of 1935 in Renewable energy#4of 12 in Senegal#322of 1801 in Gold Standard (GS)#469of 1287 in ACM0002

5.6/ 10
Integrity
5.5
Transparency
6.0
Claim Safety
5.5
Documentation
5.5

Audit Analysis

A grid-connected solar PV project in Senegal with a solid VVB-confirmed investment additionality test and consistent ERR verification (30,164 tCO₂e for the 2025 monitoring period, ~98% of pro-rata expectation). However, the project carries notable integrity concerns: a project-specific baseline, a 0% leakage deduction that the verification report flags as 'not addressed,' multiple material findings including meter accuracy and calibration gaps, and an unresolved CDM double-counting risk stemming from the project's prior CDM registration. Documentation is extensive (19 documents) but riddled with corrective actions and inconsistencies between the CDM-era PDD and the current Gold Standard registration.

Red Flags

  • CDM double-counting risk: the project was originally registered under CDM (PDD dated 2020, 15-year crediting period) and is now under Gold Standard (5-year period); the verification report lists a corrective action requiring the VVB to check for double counting, indicating the risk is not yet fully resolved.
  • Leakage deduction of 0% with justification recorded as 'not addressed' in the verification report (2025-08-24), contradicting the monitoring report's claim of 'deemed negligible' — the VVB did not confirm the leakage treatment.
  • Multiple material findings on meter accuracy (0.02S vs 0.2S class), a calibration gap between July and December 2022, and inconsistent SDG reporting across monitoring reports undermine confidence in the MRV data quality.
  • 14 corrective actions remain open, including documentation of meter changes, sample calculations for baseline values, and confirmation that land expropriation and resettlement (98 local people) were properly resolved.

Credit Vintages

IssuedRetiredAvailable
2021
16,9098,7218,188
2022
29,05429,0540
2023
24,459024,459
2024
30,164030,164
Total100,58637,77562,811

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, justification unconfirmed by VVB

Baseline

Project-specific, reassessment timing not stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CDM registration risk, CORSIA/CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05CDM-ACM0002: Grid-connected electricity generation from renewable sources - Version 20.0

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents