Grid-connected Solar PV project in Kahone
GS-2765 ↗ · current registry ID: GS10808
#1425of 1935 in Renewable energy#9of 12 in Senegal#1334of 1801 in Gold Standard (GS)#1094of 1287 in ACM0002
Audit Analysis
A grid-connected solar PV project in Senegal with confirmed additionality and reasonable ERR delivery (89% of pro-rata expectation), but undermined by a very large number of material findings, a parallel CDM/GS registration raising double-counting risk, unresolved grievances, and land-expropriation concerns. Documentation quality is weak, with low extraction confidence and over 40 corrective actions across multiple verification cycles.
Red Flags
- Parallel CDM and Gold Standard registration identified (CAR05), creating a material double-counting risk that was only addressed via a corrective action rather than a structural resolution.
- Five grievances raised during the monitoring period, four of which remained open at the time of the previous verification; one FAR raised by 'Papa DIONE' regarding grievance closure dissatisfaction.
- Land expropriation issues and a missing resettlement plan (CAR06, CAR07) indicate potential safeguarding gaps for affected communities.
- Meter MJ-2007A087-05 had a calibration gap of more than two years between initial calibration and next verification, and a second meter (Schneider ION 7650) was found non-conform in April 2025 and replaced in August 2025.
- FPIC was not conducted (explicitly recorded as false), despite the project's community-facing operations in Kahone.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 22,456 | 2,422 | 20,034 | |
| 2022 | 30,140 | 29,751 | 389 | |
| 2023 | 24,727 | 0 | 24,727 | |
| 2024 | 37,110 | 0 | 37,110 | |
| Total | 114,433 | 32,173 | 82,260 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% with quantified justification, appropriate for grid PV
Project-specific baseline, reassessed 2026
Grievance mechanism present, FPIC not conducted, 4 open grievances
Parallel CDM/GS registration; CORSIA/CCP not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →