Skip to main content
GSPVSenegalACM0002

Grid-connected Solar PV project in Kahone

GS-2765 ↗ · current registry ID: GS10808

#1425of 1935 in Renewable energy#9of 12 in Senegal#1334of 1801 in Gold Standard (GS)#1094of 1287 in ACM0002

4.5/ 10
Integrity
4.2
Transparency
4.8
Claim Safety
5.3
Documentation
3.3

Audit Analysis

A grid-connected solar PV project in Senegal with confirmed additionality and reasonable ERR delivery (89% of pro-rata expectation), but undermined by a very large number of material findings, a parallel CDM/GS registration raising double-counting risk, unresolved grievances, and land-expropriation concerns. Documentation quality is weak, with low extraction confidence and over 40 corrective actions across multiple verification cycles.

Red Flags

  • Parallel CDM and Gold Standard registration identified (CAR05), creating a material double-counting risk that was only addressed via a corrective action rather than a structural resolution.
  • Five grievances raised during the monitoring period, four of which remained open at the time of the previous verification; one FAR raised by 'Papa DIONE' regarding grievance closure dissatisfaction.
  • Land expropriation issues and a missing resettlement plan (CAR06, CAR07) indicate potential safeguarding gaps for affected communities.
  • Meter MJ-2007A087-05 had a calibration gap of more than two years between initial calibration and next verification, and a second meter (Schneider ION 7650) was found non-conform in April 2025 and replaced in August 2025.
  • FPIC was not conducted (explicitly recorded as false), despite the project's community-facing operations in Kahone.

Credit Vintages

IssuedRetiredAvailable
2021
22,4562,42220,034
2022
30,14029,751389
2023
24,727024,727
2024
37,110037,110
Total114,43332,17382,260

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

mixed evidence / unresolved risk

Leakage

0% with quantified justification, appropriate for grid PV

Baseline

Project-specific baseline, reassessed 2026

Safeguards

Grievance mechanism present, FPIC not conducted, 4 open grievances

Double-claim

Parallel CDM/GS registration; CORSIA/CCP not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05ACM0002

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents