Skip to main content
CDMWindIndiaAMS-I.D

Grid Connected Wind Electricity Generation Project in Karnataka

CDM-3553 ↗

#337of 975 in India#468of 1459 in CDM (UNFCCC)#238of 806 in AMS-I.D

5.5/ 10
Integrity
7.2
Transparency
3.5
Claim Safety
6.0
Documentation
4.0

Audit Analysis

A CDM wind project in Karnataka with a solid investment-test additionality assessment verified by RINA and a jurisdictional grid-emission-factor baseline. However, the available record is heavily skewed toward the validation stage: no verified emission reductions, no monitoring period data, and a ten-fold discrepancy between the lifetime ERR in the validation report and a figure in an appendix. Low extraction confidence and the absence of any verification or monitoring reports limit confidence in the project's ongoing performance.

Red Flags

  • ERR contradiction: the validation report (Jan 2011) states 63,680 tCO₂e lifetime, while an appendix lists 6,367.75 tCO₂e — a 10× gap that is most likely an annual-vs-lifetime mix-up but is not explicitly reconciled in the record
  • No verified emission reductions or monitoring-period data found in any of the seven extracted documents
  • Minimum extraction confidence rated 'low', indicating at least one key document was poorly readable
  • No buffer pool percentage stated, and no reversal-event history available

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test, VVB-confirmed

Permanence

Avoidance project, no reversal risk

Leakage

Deemed negligible, 0% deduction

Baseline

Jurisdictional grid EF (0.928)

Safeguards

Mentioned; FPIC & grievance not stated

Double-claim

CORSIA & CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents